# Team recovery after a busy period survey

Find practical changes after an intense workload period.

If nothing was unclear or difficult, say so. Skip questions about steps you did not experience; use not applicable where appropriate.

## 1. Which demand lasted longer than expected?

Answer: ____________________

## 2. What recovery support was useful?

Answer: ____________________

## 3. What should change before another peak?

Answer: ____________________

## Author notes / illustrative keys where applicable

1. A demand lasting beyond expectation identifies work that continued after the peak period. Review the task and duration without diagnosing health or individual resilience.
2. Useful recovery support identifies practical conditions that helped people after an intense period. Review workload arrangements and available resources, without treating reported relief as a health outcome or proof that future workload is sustainable.
3. A proposed change before another peak identifies workload or coordination conditions to review in advance. Assess feasible arrangements without treating preferences as proof of future sustainability.

Interpretation caution: Avoid collecting health diagnoses or judging resilience.
